• Project title
  • Air network conversion to ground network in Al Safa and Al Rashidiya area

Project address :

Al Rashidiya area

Project description

  • Air network conversion to ground network in Al Safa and Al Rashidiya area
  • Ground cabling connection for high voltage 6000m length and removing the air network of the overhead power line
  •  Bulding new plants and loop units to boost the area .
  • Ground cabling connection for low voltage cables for 10.000m length and installation of the distribution for the subscribers )50minipillars(
  •   Removing the low voltage air network completely .

Project value

7000000 S.R

Project period

60 Dayes

×